NEW QUESTION 26
Your company creates a separate project for infrastructure services, so as to track these costs separately and then allocate to various projects that use the services of the infrastructure team. You want to allocate these costs by first attributing a fixed percentage of the source amount to each project and then spread it across tasks based on the actual labor hours charged to each task.
Which allocation basis method would you use to meet this requirement? (Choose the best answer.)

  • A. target percentage and spread evenly
  • B. prorate
  • C. target percentage and prorate
  • D. spread evenly

Answer: C

Explanation:
Explanation
Ref:
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapjc/allocate-project-costs.html#OAPJ
* Spread Evenly
* The allocation rule divides the source pool amount equally among all the chargeable target tasks included in the rule. This is the most simple and direct basis method.
* Target Percentage and Spread Evenly
* Specify the percentage of the source pool that is required to allocate to each target line. The total specified target percentage must always equal 100 percent. The allocation rule calculates the amount to allocate to the target line, and then spreads the results evenly among the chargeable tasks.
* Prorate
* The allocation generation uses the attributes defined in the allocation rule to derive the rate at which the source pool amount is apportioned among the target projects and tasks. For this basis method, the allocation rule uses the basis attributes to apportion the source amount among all the tasks defined by the rule. The Prorate basis method provides precise control over how the rule distributes the source pool.
* Target Percentage and Prorate
* The allocation rule first uses the target percentage to calculate the amount to allocate to the line, and then apportions the results among all the tasks. The Target Percentage and Prorate basis method provides precise control over how the rule distributes the source pool.

 

NEW QUESTION 27
After completing setups in a source environment, your customer wants to move the setup data to a target environment. Identify the two statements related to task list scope, which you must consider before taking a decision based on the customer requirement. (

  • A. Exported setup data can be if the business object has scope enabled for the setup data export.
  • B. A task list can be segmented by a scope value and a task can be performed for each qualifying value of the selected object.
  • C. A scope value is used to assign users who can perform a task within an implementation project.
  • D. Exported setup data cannot be filtered by specific scope values if the business object has scope enabled for the setup data export.

Answer: A,B

Explanation:
Explanation
Reference https://docs.oracle.com/cd/E60665_01/common/OAFSM/OAFSM1166430.htm#OAFSM1166426

 

NEW QUESTION 28
Your client organization has recently undergone a restructuring exercise that has resulted in the creation of new jobs. The Resource Breakdown Structure (RBS) was previously created with existing jobs, and now the new jobs have been added to the existing Resource Breakdown Structure.
Identify the correct statement about the RBS and new resources. (Choose the best answer.)

  • A. If the "Allow resource changes at project level" option is set to No, the new resources and resource formats that are added to a Planning Resource Breakdown Structure for one project are not available for other projects.
  • B. If the "Allow resource changes at project level" option is set to Yes for the RBS, the new resources are available automatically at project level.
  • C. If the "Allow resource changes at project level" option is set to for the RBS, then the resources added to the Planning Resource Breakdown Structure are automatically available for use on the projects.
  • D. If the "Allow resource changes at project level" option is enabled for the RBS, the new resources added at project level are automatically reflected in the RBS.

Answer: C

Explanation:
Explanation
Ref:
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/fapfm/implementing-project-financial-m Topic - Entering Planning Resource Breakdown Structure Details
* Click Navigator > Setup and Maintenance, and search for the Manage Planning and Billing Resource Breakdown Structures task.
* Click the Manage Planning and Billing Resource Breakdown Structures link.
Use the Manage Planning and Billing Resource Breakdown Structures page to create new planning resource breakdown structures and to review existing planning and billing resource breakdown structures.
* Click the Create icon in the Planning Resource Breakdown Structures section.
* Use the Create Planning Resource Breakdown Structure: Basic Information page to provide basic resource breakdown structure information including the name, active dates, and project unit.
* Enter a planning resource breakdown structure name and select a date from which the resource breakdown structure is available for use.
* Optionally, provide a description and a date to which the planning resource breakdown structure is available for use.
* Select a project unit. Only projects created for the selected project unit can use this planning resource breakdown structure.
* If you want to allow project managers to add planning resources at the project level, then select the Allow resource changes at project level Tip: Changes at the project level don't move back to the parent planning resource breakdown structure.
Deselect this option to ensure all project using the planning resource breakdown structure use the same resources.
* Optionally, select a Job Set as a source of jobs for creating planning resources on your planning resource breakdown structure.
* Click Save.

 

NEW QUESTION 29
Identify the three contract attributes from Project Performance Data that are used in Project Performance dashboard regions. (Choose three.)

  • A. Projects
  • B. Expenditure Type
  • C. Contract Header
  • D. Task
  • E. Contract Line

Answer: A,D,E

Explanation:
Explanation
Reference https://docs.oracle.com/cloud/farel9/projectcs_gs/FAUAR/F1537947AN10251.htm

 

NEW QUESTION 30
Which application generates external roles to grant both function and data security? (Choose the best answer
.)

  • A. Functional Setup Manager
  • B. Business Process Manager
  • C. Oracle Identity Manager
  • D. Authorization Policy Manager

Answer: C

Explanation:
Explanation
Authorization Policy Manager (APM)
APM greatly simplifies the creation, configuration, and administration of application policies APM does not support the management of users and external roles; these artifacts can only be viewed with the tool. Their provision and management is typically accomplished using Oracle Identity Manager Oracle Identity Manager (OIM) In regard to enterprise users and external roles, Authorization Policy Manager provides viewing and searching functionality only. To manage users and external roles, use Oracle Identity Manager or some other identity management tool.
OIM provision users, roles, and defines what a user can do in Oracle Cloud Duty Roles are mapped to jobs and assigned access privileges (Data Security)

 

NEW QUESTION 31
Your customer has different accounting and project accounting periods, and sometimes enters invoices with an invoice date in the open project accounting and closed accounting periods. Which two statements are true about how project accounting and accounting dates will be populated in such invoices? (Choose two.)

  • A. Project accounting date is the first day of the first open project accounting period.
  • B. Project accounting date is the last day of the open project accounting period.
  • C. Accounting date is the first day of the first open accounting period.
  • D. Accounting date is the same as the original invoice date.
  • E. Project accounting date is the same as the original invoice date.

Answer: C,E

 

NEW QUESTION 32
You create a contract with two contract lines: Line 1 and Line 2. You create separate bill plans: A for contract Line 1 and B contract for Line 2, with a different bill set number (11 for Bill Plan A and 22 for Bill Plan B).
Then Bill Plan A is allocated against Project X - Task 10, and Bill Plan B is allocated against Project Y - Task
30.
Based on the preceding setup, you are generating invoices. Identify two correct statements about invoice generation in this scenario. (Choose two.)

  • A. Both the contract lines create only a single invoice because they are using the same contract.
  • B. Invoice generation does not depend on bill plan. The invoices are created based on the contract line.
  • C. Bill set number drives the grouping of transactions.
  • D. Two invoices are created using the same contract.

Answer: C,D

Explanation:
Explanation
Ref: https://docs.oracle.com/cd/E51367_01/projectop_gs/OAPJB/F1087456AN1006D.htm What's a bill set?
Transactions originating from different bill plans with the same bill set number on a contract are included on the same invoice. If a contract has multiple bill plans and each have different values for the bill set, Oracle Fusion Project Billing creates a separate invoice for each bill plan

 

NEW QUESTION 33
When scheduling the Update Project Performance Data process to run on a periodic basis, which summarization method would you select? (Choose the best answer.)

  • A. Bulk
  • B. Summary
  • C. Detail
  • D. Incremental

Answer: D

Explanation:
Explanation
Reference
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapfm/define-project-organizations.htm Settings That Affect Performance Data Summarization You can summarize performance data for a project unit, business unit, a range of projects, or projects managed by a project manager. When you run the Update Project Performance Data process from the Scheduled Processes page, select one of the summarization methods from the following table:
Summarization Method
Usage
Incremental
Summarizes new transactions that are yet to be summarized
Delete and re-summarize
Correct summary data when the source system data changes outside the regular transaction flow.
Do not use this summarization method when you run the Update Project Performance Data Without Producing Report process unless you are advised to do so.
Resource breakdown structure
Migrate all summary data from one resource breakdown structure version to the next.
If you select this option, you must also specify the resource breakdown structure header.

 

NEW QUESTION 34
Your organization performs revenue recognition based on the Labor and Non-labor Burden schedule types.
Identify the setup required to enable this kind of revenue recognition. (Choose the best answer.)

  • A. Create a revenue method classification with a revenue method of Percent Complete.
  • B. Create a revenue method classification with a revenue method of Percent Spent.
  • C. Create a revenue method with a revenue method classification of Rate Based.
  • D. Create a revenue method with a revenue method classification of Amount Based.

Answer: C

 

NEW QUESTION 35
Which two statements describe how the Resource Qualification Score is calculated?

  • A. An individual's score is 100% if the resource request has a qualification with a specified proficiency and the resource does not have the qualification.
  • B. An individual's score is 100% if the resource request has a qualification, but no proficiency is specified, and the resource has the qualification.
  • C. An individual's score is 100% if the resource request has a qualification with a specified proficiency and the resource has the qualification with a proficiency that is lower or higher than specified.
  • D. An individual's score is 100% if the resource request has a qualification with a specified proficiency and the resource has the qualification that meets the specified proficiency.

Answer: C,D

 

NEW QUESTION 36
Which five steps are required for the File-Based Data Import Integration option?

  • A. Import data into various applications.
  • B. Download an Excel template.
  • C. Populate the spreadsheet with data and generate a CSV file.
  • D. Run Process to transfer data to interface tables.
  • E. Install an Excel add-in.
  • F. Upload the file to the server.

Answer: B,C,D,E,F

Explanation:
Explanation
Ref:
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oefpp/overview.html#External_Data_In

 

NEW QUESTION 37
As part of maintaining (importing new employees that were added last week) project enterprise labor resources in your organization, you submit the Maintain Project Enterprise Labor Resources process to create and update resources based on changes in HCM. You define maintenance conditions on the Manage Project Enterprise Labor Resource page to process both employees and contingent workers. (Choose the best answer.)

  • A. Pool Membership
  • B. Person Type
  • C. attributes that the project enterprise resources are assigned after creation
  • D. Jobs

Answer: B

Explanation:
Explanation
Reference https://docs.oracle.com/cloud/farel8/projectcs_gs/OAPEX/F1082603AN23E61.htm Manage Project Enterprise Labor Resource Maintenance Conditions Project Enterprise Labor Resources: How They Are Automatically Created and Maintained Run the Maintain Project Enterprise Labor Resources process to create resources, remove resource availability for staffing, and maintain the resource search index.
Settings That Affect the Maintain Project Enterprise Labor Resources Process Create and maintain project enterprise labor resources by defining a set of conditions that specify the employees and contingent workers in Oracle Fusion Human Capital Management (HCM) to create as resources in Oracle Fusion Project Portfolio Management. Define the resource attribute values, such as the resource calendar and primary project role, to assign to the new resources.
The following table lists the criteria that you define for selecting HCM persons to create as project enterprise labor resources.
Selection Criteria
Description
Person type
Select the HCM person type for the process to use as criteria when selecting HCM persons to create as resources. Available person types are employees, contingent workers, or both employees and contingent workers.
Option to select people based on job
Select this option for the process to create resources for HCM persons with specific jobs.
Caution If you do not select job criteria for this condition, the process will create resources for all eligible people based only on the person type.
Jobs
If you selected the option to select people based on job, then select the jobs for the process to use as HCM person selection criteria.
The following table lists the attributes for which you specify values to assign to resources that are created for the condition.
Resource Attribute
Description
Option to manage resource availability and staffing
Select this option for resource managers to manage the availability and project staffing of resources who are created based on the condition. Resources who are managed in Oracle Fusion Project Resource Management are eligible to fulfill project resource requests.
Calendar
Select the resource calendar for resources that are created based on the condition. The resource calendar defines the work schedule for project enterprise labor resources, and includes working days and hours and any exceptions, such as holidays.
Primary project role
Select the primary project role for resources that are created based on the condition. Project roles are maintained in Oracle Fusion Project Management.
Cost rate and currency
Enter the cost rate and currency for resources that are created based on the condition.
Bill rate and currency
Enter the bill rate and currency for resources that are created based on the condition.

 

NEW QUESTION 38
Your customer wants a project start date to cascade to the project tasks but does not want the finish date to be cascaded. Identify the default setup in a project template that can be used to enable this. (Choose the best answer.)

  • A. Cascade change to the start date.
  • B. Cascade change to the start date and the finish date.
  • C. Do not cascade date changes.
  • D. Cascade change to the finish date.

Answer: A

Explanation:
Explanation
Reference
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapfm/project-control-configuration-ma Topic - Project Date Cascade Options Use the Cascade option choice list to determine whether your changes to project dates cascade to tasks.
Use the Basic Information region on the Edit Project Template page to select one of the following options:
* Do not cascade project date changes to tasks: Both start and finish dates are editable. However, you must ensure the following:
* The project start date is not later than the earliest task date.
* The project finish date is not earlier than the latest task date.
* Cascade project start date change to affected tasks: You can edit only the project start date.
* Cascade project finish date change to affected tasks: You can edit only the project finish date.
Do not cascade project date changes to tasks is the default value. You must select the cascade option each time you change the project dates, as your selection isn't saved for future date changes.
If you select to roll up planned dates for tasks or are using an external application for scheduling, then you can't modify the project start or finish dates.

 

NEW QUESTION 39
Your client has implemented Oracle Cloud Applications with their United States business unit and United Kingdom business unit. After six months, they acquired another company in China and added a China business unit. A project accountant in your organization is authorized to access transactions for the US, UK, and China business units. The project accountant can see the transactions for the US and UK business units but not for the China business unit. Why is he not able to see the transactions for the China business unit? (Choose the best answer.)

  • A. The China business unit is associated with a different legal entity than the US and UK business units.
  • B. The project accountant is not that grants access to the China business unit.
  • C. The US and UK business units are linked to different ledgers than the China business unit.
  • D. The application role relevant to the China business unit is not assigned to the project accountant.

Answer: B

 

NEW QUESTION 40
Your client uses Resource Breakdown Structures (RBS) and Resource Mapping to associate amounts to resources. After making some changes to the resources at project level, forecasts are regenerated. After reviewing the cost amounts associated with the resources, you suspect that the cost association does not match your client's expectations. Identify two valid rules based on which cost association works. (Choose two.)

  • A. If the sum of precedence numbers is the same for more than one branch, precedence is given to the branch with the lowest number at the lowest level.
  • B. If a transaction maps to more than one level, Oracle PPM Cloud sums the precedence numbers for all resource type in the branch and gives precedence to the resource element in the branch with the highest sum.
  • C. If there is only one level in RBS to which the transaction maps, the cost amounts are mapped to that level.
  • D. If one branch contains a user-defined resource type, precedence is given to the branch that contains a user-defined resource type.

Answer: A,C

Explanation:
Explanation
Reference https://docs.oracle.com/cd/E37583_01/doc.1116/e22598/F458900AN13D82.htm How Resource Mapping Is Calculated You can track the cost impact of every resource that has been assigned to a project task and use the resource breakdown structure to view the breakdown of these costs. Oracle Fusion Projects associates the costs of the resources used for tasks with branches and levels in the resource breakdown structure. The process for determining the correct association is managed by rules of precedence.
Oracle Fusion Projects uses the following ts with resources:
* Select the lowest level in the resource breakdown structure to which a transaction can map.
* If there is only one level to which the transaction maps, the cost amounts are mapped to that level.
* If the transaction maps to more than one level, Oracle Fusion Projects sums the precedence numbers for all resource types in the branch and gives precedence to the resource element in the branch with the lowest sum.
* If more than one branch has the lowest precedence number at the lower level, the application uses the precedence number of the next level up.
* If the sum of precedence numbers is the same for more than one branch, precedence is given to the branch with the lowest number at the lowest level.
* If one branch contains a user-defined resource type, precedence is given to the branch that does not contain a user-defined resource type.
Note Oracle Fusion Projects gives more precedence to a lower precedence number. For example, a resource element with a precedence number of 1 is given precedence over a resource element with a precedence number of 10.

 

NEW QUESTION 41
Which setup option is common to both financial and project plan types?

  • A. Enable the entry of plan amounts in currencies other than the project currency.
  • B. Enable the use of a workflow for managing budget or forecasting status changes.
  • C. Manage the options for creating control budgets in Oracle Fusion Budgetary Control.
  • D. Identify whether the plan type is the default selection when you create budget or forecast versions.

Answer: A

Explanation:
Explanation
Ref:
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapfm/project-control-configuration-ma Financial and Project Plan Setup Options The following table describes the basic budget, forecast, or project plan setup options that determine how a plan type is used in the context of a project. Except for third-party scheduling, you can't edit these options at the project level.
Option
Location
Description
Planning amounts
Financial plan type
Indicates that the financial plan type supports the creation of versions with the following amounts:
* Cost amounts
* Revenue amounts
* Both cost and revenue amounts
* Either cost or revenue amounts
Approved budget or primary forecast
Financial plan type
Determines whether a financial plan type is used for creating approved budget versions or primary forecast versions that are used for plan comparison or project performance reporting.
Default financial plan type
Financial plan type
Determines whether the financial plan type is the default selection when you create budget or forecast versions.
Workflows
Financial plan type
Enables the use of a workflow for managing budget or forecast status changes.
Third-party scheduling software
Project plan type
Indicates whether project planning is performed in Microsoft Project.
If third-party scheduling is disabled in the project plan type, you can use the associated project or project template to create a project in Microsoft Project. However, you can't export the new project or link it to one created in Oracle Fusion Project Portfolio Management.
Multiple transaction currencies
Financial and project plan type
Enables entry of plan amounts in currencies other than the project currency.
Budgetary control settings
Financial plan type
Manages options for creating control budgets in Oracle Fusion Budgetary Control.

 

NEW QUESTION 42
Which three are true of what you can do in the Project Requirements work area?

  • A. Create an implementation project.
  • B. Organize backlog items by requirements.
  • C. Manage your list of backlog items.
  • D. Create project tasks for backlog items.
  • E. Create an execution project.

Answer: B,C,D

Explanation:
Explanation
Ref:
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapem/manage-project-requirements.ht Project Requirements: Explained Requirements enable you to capture your business needs. If you manage projects using the Agile development methodology, you start by identifying the high-level requirements and decomposing them further to manage the completion of work on the requirement.
You use the Project Requirements work area to:
* Organize backlog items by requirements
* Manage your list of backlog items
* Create project tasks for backlog items

 

NEW QUESTION 43
Identify the valid approval group type applicable to Oracle Project Financial Management Cloud. (Choose the best answer.)

  • A. Flexfield
  • B. Position
  • C. Static
  • D. Dynamic
  • E. Job

Answer: C

Explanation:
Explanation
Ref:
https://docs.oracle.com/en/cloud/saas/applications-common/19b/facia/define-approval-management.html#FACIA Topic Approval Groups Each approval group includes a set of users that you configure to act on tasks in a certain pattern. Tasks can be defined to get routed to an approval group instead of an individual user. You can nest approval groups within approval groups.
You have two options for defining the group:
* Static: Select the specific users to include in the group.
* Dynamic: Provide the logic to use to determine the users in the group.

 

NEW QUESTION 44
While opening an organization tree on the Manage Organization Trees page, you notice that the hierarchy status is displayed as Inactive. Identify the two reasons for the organization tree to be in Inactive status. ( Choose two.)

  • A. You opened the hierarchy by clicking the name.
  • B. You selected the Edit icon for opening the hierarchy.
  • C. You used Create Tree Version in the action menu.
  • D. You used Create Tree in the action menu.
  • E. You used View Tree Version in the action menu.

Answer: B,D

 

NEW QUESTION 45
You have a small project for a period of five months. Your budget amount for each month is spread evenly and is $1000 per month. The first month actual expense is $800 and there is a commitment for $600. Now you generate a forecast at the beginning of the second month. Identify the monthly Estimate-To-Complete (ETC) amount that the application would calculate for the remaining four periods, when the ETC generation method includes commitments. (Choose the best answer.)

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: A

Explanation:
Explanation
Budget 5,000Actuals 800Commitment 600
ETC = Budget - Actuals - Commitment
ETC = 5,000-800-600 = 3,600 Budget available for next 4 months = 3,600/4 = 900/month

 

NEW QUESTION 46
Identify two attributes for which you can enter budgets that will be considered for Budgetary Controls in Project Portfolio Management. (Choose two

  • A. project plan type
  • B. project classification
  • C. project
  • D. resource
  • E. expenditure item

Answer: C,D

Explanation:
Explanation
Reference https://docs.oracle.com/cloud/latest/projectcs_gs/OAPJF/OAPJF1121937.htm#OAPJF1121937

 

NEW QUESTION 47
Your customer wants to see how quantity, cost, and revenue amounts are automatically distributed by using Spread Curve. Identify two period options that are available for this purpose. (Choose two.)

  • A. Accounting Periods
  • B. PA Calendar
  • C. Project Accounting Periods
  • D. Calendar Types
  • E. PA-GL Periods

Answer: A,C

Explanation:
Explanation
Reference
https://fusionhelp.oracle.com/helpPortal/topic/TopicId_P_87F467307D50416BE040D30A68816855 Spread curves let you distribute quantity, cost, and revenue amounts automatically across accounting or project accounting periods. You assign a spread curve to each resource class. Planning resources (in the planning resource breakdown structure) inherit the spread curve setting from the associated resource class.
You can change the spread curve for the planning resource and for any corresponding task assignments, or budget or forecast lines.

 

NEW QUESTION 48
You are implementing Project Portfolio Management (PPM) for a professional services firm. The firm rents multiple buildings for its operations. At the end of each month, they review the rent expense for the month and want to allocate the rental cost to all the projects and tasks that are executed by associates in each of the buildings. The source amounts must be proportionally allocated to the tasks based on the raw costs of the tasks from the previous month. Considering that all these costs are in General Ledger, what three allocation setups should you complete in PPM? (Choose three

  • A. Allocate rental costs once each accounting period by using the "spread evenly" allocation method.
  • B. Allocate to all eligible tasks and prorate the allocation by the actual raw cost accrued for each task during the previous accounting period
  • C. Define allocation basis by using Actual Amounts with a period-to-date amount class.
  • D. Allocate rental costs once each accounting period by using the "full" allocation method.
  • E. Define allocation basis by using Actual Amounts with a project-to-date amount class.

Answer: B,C,D

 

NEW QUESTION 49
Your customer wants to perform billing based on the Percent Spent invoice method. Identify two setups that are required in project contracts for calculating invoice amounts as per their requirement. (Choose two.)

  • A. billing events
  • B. bill plan
  • C. expenditure items
  • D. invoice method
  • E. billing controls

Answer: B,E

Explanation:
Explanation
Ref:
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapjb/create-customer-contract.html#O Bill Plan - Create a bill plan within a contract that uses the invoice method you require. Assign the bill plan to one or more contract lines. A set of instructions on a contract that define how to invoice a customer. Multiple contract lines on a contract can use the same or different bill plans. Invoice Method is used in creating Bill Plan - not a separate setup.
Billing Controls - Contract feature that controls the types of transactions, dates, and amounts a customer may be invoiced for and revenue can be recognized for a contract or contract line. Define billing controls at the contract or contract line level.
Topic - Creating a Contract for Percent Spent Invoice and Revenue Methods: Worked Example This example describes a scenario where transactions for a contract line need to be invoiced and the revenue recognized using the percent spent method.
What are the revenue and invoice method classifications?Percent Spent
What is the billing extension calculation level for the contract line and project association?Project level Summary of the Tasks Create a contract, create the percent spent contract lines, create the bill plan, create the revenue plan.
Prerequisites
* Create a project.
* Create the project plan for percent spent revenue. Specify the plan type on the percent spent billing extension.
* Create an approved cost budget.
* Create cost and burden rates.
* Enter labor and expense transactions for the project.
* Collect costs for the transactions.
Configuration Steps
* Creating the Contract
* Creating the Percent Spent Contract Lines
* Creating the Bill Plan - A set of instructions on a contract that define how to invoice a customer.
Multiple contract lines on a contract can use the same or different bill plans.
* Creating the Revenue Plan - Common set of instructions for recognizing revenue within a contract.
Multiple contract lines on a contract can use the same or different revenue plans.
Invoice method classifications determine how transactions are invoiced. The invoice method determines how invoice amounts are derived.
* Enter an invoice method on a bill plan, which you create for a contract and assign to contract lines to provide a set of instructions for creating an invoice.
* Create billing controls for a contract or contract line to define the valid transaction dates, billing resources, and amount limits for transactions associated with the contract.
* Generate invoices to calculate the invoice amounts for a contract.
The following figure illustrates the components of a project and a contract that determine invoice amounts, and the relationships between the components.
Project and contract components used to determine invoice amounts and generate invoices.

 

NEW QUESTION 50
Which application would you use to map application roles to external roles? (Choose the best answer.)

  • A. Security Console
  • B. Authorization Policy Manager
  • C. BPM Work List
  • D. Oracle Identify Manager

Answer: B

Explanation:
Explanation
Ref: https://docs.oracle.com/cd/E17904_01/doc.1111/e14431/managing.htm#APMAG3333 Fusion Middleware Administrator s Guide for Authorization Policy Manager Managing Security Artifacts This chapter describes the procedures an administrator follows to manage application-specific security artifacts, view the external role hierarchy, manage the application role hierarchy, and manage the many-to-many mapping of application roles to external roles from both the application and the external role point of view.
This chapter is divided into the following sections:
* Managing Application Security Artifacts
* Viewing the External Role Hierarchy
* Managing the Application Role Hierarchy
* Mapping Application Roles to an External Role
* Mapping External Roles to an Application Role
Role Mapping Policy
* A Role Mapping Policy is used to determine what external subjects (users, groups or External Roles) are assigned to the applicable Application Role. The Application Role, when referenced in an Authorization Policy, defines the principals affected by the Authorization Policy. Role Mapping Policies may also include conditions Oracle Identity Manager - Not used for mapping application roles to external roles How do Users Interact with Oracle Identity Manager?
Oracle Identity Manager provides an end-user interface, called the Identity Self Service console, and a system administrator interface, called the Identity System Administration console. Both end-users and system administrators use the web browser to log on to Oracle Identity Manager. Oracle Identity Manager (OIM)
* OIM provision users, roles, and defines what a user can do in Oracle Cloud
* Duty Roles are mapped to jobs and assigned access privileges (Data Security)

 

NEW QUESTION 51
......